First, the purlins color didn't turn out quite right. Instead of maroon, it's more of a hot pink. I've already talked with the painters and they'll correct it. No problem there.
However, I also talked to the tile guy I've waited two weeks for. It took some sleuthing, but I tracked his number down and tonight he told me our builder had put him on another job to do first and he won't be done for at least a week and a half. That job is for two showers. We're having two showers, a tub, flooring and backsplash done. I'm concerned with how long this will take. I'm also a little upset our builder put whatever job it was ahead of us. We are beyond ready to move into the barndo and I'm really losing my patience!
Thoughts? Any way I can light a fire similar to what it feels like in our RV?